
Swept Path Analysis for Planning Applications
Swept path analysis uses vehicle tracking software to plot the space a vehicle needs as it moves: the path of its wheels and the overhang of its body as it turns, reverses and manoeuvres. The result is a drawing that shows whether a vehicle can safely enter, turn within and leave a site without striking kerbs, buildings, parked cars or street furniture.
Councils and highway authorities routinely ask for it when a development changes how vehicles reach or move within a site: a new or altered site access, a car park or driveway layout, a refuse collection point, a servicing or loading area, or fire appliance access to a building. It is also a standard part of Construction Logistics Plans, where construction vehicles must reach the site safely.
If a layout doesn't work, the analysis shows exactly where and by how much. We then work with your architect to adjust kerb lines, access widths, turning heads or parking bays until it does, before the scheme reaches the planning officer.
Our Swept Path Analysis Services
Refuse and Servicing Vehicles
We check that refuse collection vehicles and delivery vans can reach collection and loading points and turn safely, in line with council waste and servicing requirements.
Fire Appliance Access
We test fire appliance routes to buildings, so access for the fire service can be shown at planning and Building Regulations stage.
Car Parks and Driveways
We check that cars can enter, park, turn and leave parking spaces, car parks and driveways without unrealistic manoeuvres.
Site Access and Junctions
We test new and altered accesses, junctions and turning heads for the largest vehicles expected to use them.
Construction Vehicle Routes
We check that construction vehicles can reach and enter the site safely, supporting your Construction Logistics Plan.
Drawings for Submission
We provide clear swept path drawings with a short note explaining the results, ready to submit with your planning application or technical approval package.
Case Study: Coach Drop-Off at a Major Visitor Site
We tested how 12-metre coaches arrive at, stop in and leave a dedicated coach drop-off area beside a busy car park. Our swept path drawings confirmed the layout gives coaches enough room for both movements.


Why Swept Path Analysis Matters
A layout that looks workable on plan can fail in practice once real vehicle sizes and turning circles are applied. Finding that out at the planning stage is far cheaper than after construction, when kerbs, walls and parking are already built.
A clear swept path drawing gives the planning officer and highway authority the evidence they need, reducing queries and the risk of refusal or pre-commencement conditions. It also protects the people who will use the site, from refuse crews and delivery drivers to the emergency services, and gives your design team certainty before details are fixed.
