
Highway Design Expertise for Developments in Westminster
Westminster is one of London's most complex highway environments, combining world-famous landmarks, heavily trafficked strategic roads, historic streets, and high levels of pedestrian activity. New developments within the borough require highway designs that balance safety, accessibility, traffic efficiency, and the expectations of Westminster City Council alongside Transport for London where applicable.
At Capital Transport Planning, we prepare detailed highway designs that support residential, commercial, mixed-use, educational, and public sector developments throughout Westminster. Our team understands the challenges associated with designing highway improvements within densely developed urban environments where space is limited and existing infrastructure must remain operational throughout construction.
Whether a project involves a new vehicle access, alterations to the public highway, junction improvements, or streetscape enhancements, we develop practical, policy-compliant designs that integrate with the surrounding transport network. Every scheme is prepared using current design standards while considering pedestrian safety, cycling infrastructure, servicing requirements, drainage, visibility, accessibility, and future maintenance obligations. Our collaborative approach helps minimise planning delays and supports efficient delivery from concept through to construction.
Highway Design in Westminster
Vehicle Access & Highway Layout Design
We design safe and efficient vehicle access arrangements, internal road layouts, and highway connections that meet local authority standards while supporting the operational requirements of each development.
Section 278 & Section 38 Highway Designs
Our engineers prepare technical drawings and supporting documentation for Section 278 and Section 38 agreements, ensuring proposed highway works satisfy approval requirements and construction standards.
Junction & Highway Improvement Design
We create detailed designs for junction upgrades, carriageway alterations, pedestrian crossings, and traffic management improvements that enhance safety and network performance.
Footway, Cycleway & Public Realm Design
Our highway designs incorporate high-quality pedestrian routes, cycling infrastructure, paving layouts, kerb alignments, and public realm improvements that encourage sustainable travel.
Swept Path & Vehicle Tracking Analysis
We undertake swept path assessments to demonstrate that service vehicles, refuse trucks, emergency vehicles, and delivery vehicles can safely manoeuvre through the proposed highway layout
Drainage, Kerbing & Highway Construction Details
We produce detailed engineering drawings covering highway drainage, kerb construction, pavement build-ups, road markings, signage, and other essential construction elements required for implementation.
How We Approach Highway Design in Westminster
Take a commercial property in Westminster that needs a new vehicle crossover, wider footways and revised kerb lines to fit servicing in while keeping traffic moving.
For a scheme like this, we would prepare drawings, swept path analysis, visibility assessments and construction details for the highway authority, taking account of utilities, pedestrian movements, cycling facilities and nearby public transport.
The result would be a technically robust, policy-compliant design meeting both operational needs and public safety.


Highway Design That Supports Planning Success
A professionally prepared highway design provides the technical foundation needed to demonstrate that a development can operate safely and efficiently within the existing transport network. High-quality engineering drawings help planning officers, highway authorities, contractors, and stakeholders understand how proposed highway works will function while ensuring compliance with current standards and local planning policies.
At Capital Transport Planning, we develop practical, buildable highway designs that consider every stage of project delivery. From initial feasibility studies through detailed engineering design and highway approvals, our team works closely with architects, developers, and consultants to reduce technical risks, resolve potential issues early, and support successful planning outcomes. Our experience across complex urban environments allows us to produce solutions that balance engineering excellence with the operational needs of modern developments.
Frequently Asked Questions
Do I need highway design drawings for a development in Westminster?
Many developments involving new accesses, highway alterations, or works affecting the public highway require detailed highway design drawings to support planning applications and highway authority approvals.
Can you prepare Section 278 highway designs?
Yes. We prepare comprehensive Section 278 highway design packages, including technical drawings and supporting information required for approval by the relevant highway authority.
How long does a highway design project usually take?
Timescales vary depending on project complexity, but most highway design packages can be completed within two to six weeks, with larger or more complex developments requiring additional coordination and design review.
