
Section 278 Highway Solutions for Developments in Hackney
Hackney is one of London's fastest-evolving boroughs, with continuous regeneration, high-density developments, and an extensive network of pedestrian, cycling, and public transport infrastructure. New developments often require improvements to the surrounding highway to ensure safe access while supporting the borough's sustainable transport objectives. Where proposed works affect the adopted highway, a Section 278 Agreement is typically required before construction can proceed.
At Capital Transport Planning, we assist developers, architects, planning consultants, and contractors throughout every stage of the Section 278 process in Hackney. Our experienced team prepares detailed highway designs, technical documentation, feasibility assessments, and engineering drawings that satisfy both local authority requirements and national design standards.
Whether your project involves constructing a new access, altering footways, installing pedestrian crossings, relocating street furniture, improving junction layouts, or introducing cycle infrastructure, we provide practical engineering solutions tailored to the unique constraints of Hackney's busy urban streets. By working closely with all project stakeholders, we help minimise delays, streamline approvals, and ensure highway works are delivered safely and efficiently.
Section 278 Agreements in Hackney
Highway Design & Engineering Drawings
We produce detailed highway layouts, construction drawings, and engineering designs that meet the technical requirements for Section 278 approval while supporting efficient project delivery.
Council Liaison & Technical Approvals
Our specialists coordinate directly with the relevant highway authority, managing technical submissions, responding to review comments, and supporting the approval process from start to finish.
Access & Junction Improvement Design
We design safe and compliant vehicle accesses, junction alterations, pedestrian crossings, and highway improvements that integrate seamlessly with the surrounding transport network.
Traffic Management Planning
Where highway works affect existing traffic flows, we prepare practical traffic management strategies that prioritise safety while minimising disruption to residents, businesses, and road users.
Active Travel Infrastructure Integration
Our highway designs incorporate pedestrian and cycling improvements where appropriate, helping developments align with Hackney's emphasis on sustainable and active travel.
Construction Support & Project Coordination
From preliminary design through construction and completion, we provide ongoing technical advice, contractor coordination, and engineering support to keep your Section 278 project progressing smoothly.
Our Section 278 Agreement Project in Hackney
Capital Transport Planning recently supported a mixed-use redevelopment within Hackney that required significant highway improvements before construction could commence. The proposal included modifications to the existing vehicle access, widened footways, upgraded pedestrian crossing facilities, and adjustments to kerb alignments to improve safety around the site entrance.
Our engineers prepared the complete Section 278 design package, including detailed engineering drawings, swept path analysis, construction specifications, and supporting technical documentation. Throughout the approval process, we maintained close communication with the highway authority, addressing technical comments promptly and refining the design where required.
Particular attention was given to maintaining pedestrian accessibility, protecting existing cycling infrastructure, and ensuring construction activities caused minimal disruption within the surrounding neighbourhood. By delivering a coordinated and policy-compliant design solution, we helped the client secure the necessary approvals efficiently, allowing the development programme to remain on schedule.


Delivering Highway Improvements with Confidence
A professionally prepared Section 278 Agreement is essential for developments that require alterations to the public highway. Early planning, technically accurate designs, and effective coordination with the highway authority can significantly reduce delays and avoid costly revisions later in the project.
At Capital Transport Planning, we combine transport planning expertise with practical highway engineering knowledge to produce robust Section 278 submissions that satisfy technical standards while supporting wider development objectives. We carefully assess each site's operational requirements, existing highway conditions, pedestrian movement, accessibility, drainage considerations, and traffic impacts before developing practical design solutions.
Our collaborative approach ensures clients receive clear guidance throughout every stage of the process, from initial feasibility through design development, technical approval, construction support, and final completion. By identifying potential issues early and maintaining proactive communication with all stakeholders, we help deliver highway works that are safe, compliant, and fully integrated into Hackney's evolving transport network.
