
Delivering Section 278 Highway Solutions Across Hillingdon
Hillingdon is one of London's largest boroughs and contains a diverse transport network that includes major strategic roads, residential neighbourhoods, industrial estates, and nationally significant infrastructure such as Heathrow Airport. New developments within the borough often require alterations to the existing highway network to maintain safety, accessibility, and traffic efficiency. Where these works affect publicly maintained highways, a Section 278 Agreement is typically required before construction can begin.
Our team has extensive experience supporting developers, architects, planning consultants, and contractors with Section 278 schemes throughout Hillingdon. We understand the technical standards expected by the local highway authority and prepare fully compliant highway designs, technical documentation, and supporting reports to facilitate a smooth approval process.
Whether your project requires a new site access, junction improvements, pedestrian crossings, cycle infrastructure, traffic calming measures, or highway realignment, we provide practical engineering solutions that integrate with existing transport infrastructure while supporting planning objectives and future network performance.
Section 278 Agreements in Hillingdon
Section 278 Highway Design
We prepare detailed highway improvement designs that comply with national design guidance and local authority standards, ensuring proposed works are suitable for technical approval.
New Access & Junction Improvement Design
Our engineers design safe vehicle access points, priority junctions, signal improvements, and highway alterations that accommodate forecast traffic while improving road safety.
Technical Approval & Highway Authority Liaison
We manage communication with the relevant highway authority throughout the approval process, responding to technical comments and coordinating design revisions where necessary.
Road Safety & Visibility Assessments
We assess visibility splays, vehicle tracking, pedestrian safety, and overall highway operation to ensure proposed works meet current safety standards.
Walking, Cycling & Accessibility Improvements
Our Section 278 schemes incorporate upgraded footways, cycle facilities, dropped kerbs, tactile paving, and accessibility enhancements that encourage sustainable travel.
Construction Coordination & Technical Support
From preliminary design through technical approval and construction stages, we provide ongoing engineering support to help keep projects progressing efficiently.
Supporting Highway Improvements for a Commercial Development in Hillingdon
Our team recently assisted with a commercial development within Hillingdon that required highway improvements as part of its planning consent. The proposal involved creating a new vehicular access from an existing public highway together with upgrades to nearby footways and pedestrian crossing facilities.
Following a detailed review of the surrounding highway network, we prepared the Section 278 highway design package, vehicle tracking assessments, visibility analysis, and technical drawings required for submission. Throughout the project we worked closely with the relevant highway authority to address design comments and ensure every aspect of the proposal met current engineering standards.
The coordinated approach reduced delays during technical approval and enabled the client to progress towards construction with confidence, knowing that the required highway works fully supported the approved development.


Professional Section 278 Support for Successful Developments
A well-managed Section 278 Agreement is essential whenever development proposals require alterations to the public highway. Delays in highway approvals can impact planning conditions, construction programmes, and overall project costs if technical requirements are not addressed correctly from the outset.
Capital Transport Planning provides comprehensive support throughout every stage of the process, from feasibility studies and preliminary design to detailed engineering, technical approval, and implementation advice. Our collaborative approach ensures highway improvements are practical, policy compliant, and designed to minimise disruption to existing road users.
By identifying design challenges early, coordinating with highway authorities, and producing high-quality technical documentation, we help developers achieve efficient approvals while delivering highway infrastructure that benefits both the development and the wider Hillingdon transport network.
