
Section 278 Highway Works in Richmond upon Thames
Richmond upon Thames is recognised for its historic character, extensive green spaces, and carefully managed highway network. Developments across the borough often require improvements to the existing public highway to provide safe and efficient access for vehicles, pedestrians, and cyclists. Where these works fall within the adopted highway, a Section 278 Agreement is typically required before construction can begin.
At Capital Transport Planning, we assist developers, architects, planning consultants, and contractors throughout every stage of the Section 278 process. Our experienced team prepares technical highway designs, liaises directly with the London Borough of Richmond upon Thames, and supports applications from initial feasibility through to technical approval and construction.
Whether your project involves a residential development, commercial premises, educational facility, healthcare scheme, or mixed-use site, we ensure all proposed highway improvements satisfy local authority requirements while integrating safely with the surrounding transport network. Our practical approach helps minimise delays, reduce design revisions, and keep development programmes moving forward.
Section 278 Agreements in Richmond upon Thames
Highway Access Design
We prepare detailed highway layouts for new and altered site access arrangements, ensuring safe vehicle movements while meeting current design standards and local authority expectations.
Footway & Crossing Improvements
Our engineers design improvements to footways, pedestrian crossings, dropped kerbs and accessibility features that enhance safety for all highway users and support inclusive travel.
Junction & Highway Modification Design
Where developments require alterations to nearby junctions or carriageways, we develop compliant engineering designs supported by the necessary technical assessments.
Technical Approval & Local Authority Coordination
We manage submissions, technical queries and design reviews with the London Borough of Richmond upon Thames, helping progress your Section 278 Agreement efficiently.
Road Safety & Active Travel Integration
Our highway proposals consider pedestrian safety, cycling infrastructure and sustainable transport objectives to create designs that complement the existing highway environment.
Construction Support & Agreement Delivery
From preliminary design through construction and final approval, we provide ongoing technical support to help deliver highway works in accordance with approved Section 278 requirements.
How We Approach a Section 278 Scheme in Richmond upon Thames
Take a residential development in Richmond upon Thames that needs a new access, rebuilt footways, upgraded crossings and new road markings before occupation.
For a scheme like this, we would review the surrounding network, prepare drawings for Section 278 approval and work with the highway authority to refine the design and meet the relevant standards.
The result would be an efficient approval process with less programme risk, delivering safer access and better pedestrian links.


Supporting Highway Approval for Successful Development
A well-managed Section 278 Agreement is essential whenever development proposals require permanent works on the adopted highway. Early planning, technically accurate designs and effective communication with the highway authority all contribute to a smoother approval process.
At Capital Transport Planning, we combine highway engineering expertise with extensive planning experience to deliver practical, policy-compliant solutions tailored to each development. We identify design challenges early, coordinate with relevant stakeholders, and produce high-quality documentation that helps avoid unnecessary revisions. Whether your scheme is large or small, our objective is to simplify the technical approval process while supporting timely project delivery.
Frequently Asked Questions
When is a Section 278 Agreement required in Richmond upon Thames?
A Section 278 Agreement is generally required whenever a development involves permanent works on the adopted public highway, such as creating a new access, altering junctions, widening footways or installing pedestrian crossing facilities.
How long does the Section 278 approval process take?
Timescales vary depending on the complexity of the proposed highway works, design revisions and authority review periods. Starting the process early and providing comprehensive technical information can significantly improve programme efficiency.
Can you manage the entire Section 278 process?
Yes. We provide end-to-end Section 278 support, including feasibility assessments, detailed highway design, technical approval submissions, coordination with the London Borough of Richmond upon Thames, and construction-stage assistance until the agreement is completed.
