top of page

Section 278 in Hounslow

We provide Section 278 services in Hounslow, helping developers, landowners, and consultants secure highway approvals for works on the public highway while supporting smooth planning and project delivery.

Section 278 Highway Agreements in Hounslow

Hounslow is one of West London's fastest-growing boroughs, with ongoing residential, commercial, industrial, and mixed-use developments taking place alongside a strategically important transport network. Major corridors including the A4 Great West Road, A312, A315, and routes serving Heathrow Airport require careful planning whenever development proposals involve changes to the public highway. Section 278 Agreements enable developers to undertake highway improvements that are necessary to safely accommodate new developments while meeting the requirements of the local highway authority.

At Capital Transport Planning, we provide specialist Section 278 consultancy services throughout Hounslow, supporting projects from the initial feasibility stage through detailed highway design, technical approvals, and construction coordination. We work closely with developers, architects, engineers, and planning consultants to prepare designs that satisfy both operational requirements and local highway standards. Whether your scheme requires a new access road, upgraded junction, pedestrian crossing, cycle infrastructure, or alterations to existing highways, our experienced team delivers practical, compliant, and efficient solutions tailored to your development.

Section 278 in Hounslow

Highway Design & Technical Drawings

We prepare detailed highway designs and engineering drawings that comply with Hounslow's technical requirements, ensuring all proposed highway alterations are suitable for approval under a Section 278 Agreement.

Junction & Access Design

Our consultants design safe and efficient site access arrangements, new junctions, and highway modifications that improve vehicle movements while protecting road users and supporting future development demands.

Pedestrian & Cycle Infrastructure

We incorporate modern active travel principles into highway improvement schemes, designing footways, crossing facilities, cycle routes, and accessibility improvements that align with current transport policies.

Highway Authority Liaison

Our team manages technical discussions with the highway authority throughout the approval process, helping resolve design comments efficiently and keeping projects progressing towards approval.

Utility & Construction Coordination

We coordinate highway designs with existing utilities, drainage requirements, and construction constraints to minimise disruption and reduce the risk of delays during implementation.

Section 278 Approval Management

From preliminary design through technical approval and agreement completion, we oversee the entire Section 278 process, ensuring all required documentation is prepared accurately and submitted on time.

Delivering Section 278 Highway Improvements in Hounslow

Our team recently supported a commercial redevelopment project in Hounslow that required significant alterations to the adjacent public highway before occupation could take place. The development included a new site access, improved pedestrian facilities, revised road markings, and upgraded vehicle turning arrangements to safely accommodate increased traffic movements.

We prepared the detailed engineering design, undertook swept path analysis, coordinated drainage considerations, and responded to technical comments received during the approval process. Throughout the project, we worked collaboratively with the design team and highway authority to refine the proposals while maintaining compliance with local standards. By proactively addressing technical queries and ensuring all supporting documentation was prepared correctly, the Section 278 Agreement progressed efficiently, allowing construction works to proceed without unnecessary delays and supporting the wider planning objectives of the development.

ChatGPT Image Apr 16, 2026, 12_17_20 PM.png
ChatGPT Image Mar 31, 2026, 02_41_39 PM.png

Reliable Section 278 Support for Planning and Delivery

Section 278 Agreements are an essential part of many development projects where improvements to the existing highway network are required. Poorly coordinated highway designs or incomplete technical submissions can lead to lengthy approval times, additional costs, and delays to construction programmes. Our experienced transport planning and highway engineering specialists help reduce these risks by producing accurate, policy-compliant, and technically robust designs from the outset.

We understand the importance of balancing highway safety, operational efficiency, sustainable travel, and development viability. Every project receives a tailored approach that reflects the site's characteristics, surrounding road network, and planning requirements. From relatively straightforward access improvements to more complex highway infrastructure schemes, we provide practical advice throughout every stage of the Section 278 process.

By engaging Capital Transport Planning early in your project, you benefit from coordinated design solutions, effective communication with highway authorities, and efficient management of technical approvals. Our objective is to help developers satisfy planning conditions, minimise project risks, and deliver highway works that integrate successfully with Hounslow's transport network while supporting safe movement for motorists, pedestrians, cyclists, and public transport users.

Frequently Asked Questions

Do I need a Section 278 Agreement in Hounslow?

A Section 278 Agreement is generally required whenever a development proposes works on the existing public highway, such as creating a new vehicle access, modifying a junction, widening footways, or installing pedestrian crossings. The highway authority will determine whether the agreement is necessary.

How long does the Section 278 approval process take?

Timescales vary depending on the complexity of the proposed highway works, the number of technical reviews required, and stakeholder consultation. Early engagement and well-prepared engineering designs can significantly improve the overall approval programme.

Can Capital Transport Planning manage the complete Section 278 process?

Yes. We provide comprehensive Section 278 consultancy services, including feasibility advice, detailed highway design, technical submissions, liaison with the highway authority, design revisions, and support through approval and implementation, helping clients successfully deliver highway works associated with their developments.

Picture1.png

Capital Transport Planning is an independent consultancy delivering expert transport planning and infrastructure solutions across the UK.

  • Facebook
  • Youtube
  • Instagram
  • LinkedIn

Richmond Office,
Greater London

Address: Parkshot House, 5 Kew Road Richmond upon Thames, TW9 2PR

E: info@capitaltp.co.uk
P: +44 (0)208 1681 911

© 2026 by CTP. All rights reserved.

Website Made By DesignByComfy

bottom of page