Section 278 in Kingston upon Thames
We provide professional Section 278 services in Kingston upon Thames, helping developers secure technical approval and deliver highway improvement works required to support residential, commercial, and mixed-use developments while meeting local authority and highway authority requirements.
Kingston upon Thames Highway Planning and Section 278 Expertise
Kingston upon Thames continues to experience significant residential regeneration, commercial investment, and town centre redevelopment, placing increasing importance on well-planned highway infrastructure. Many planning applications within the borough require improvements to the existing public highway to safely accommodate additional vehicle, pedestrian, and cycle movements. Where these works affect the adopted highway, a Section 278 Agreement is typically required before construction can begin.
At Capital Transport Planning, we support developers, architects, planning consultants, and contractors throughout every stage of the Section 278 process in Kingston upon Thames. Our experienced transport planners and highway engineers prepare compliant highway designs, technical documentation, and engineering drawings while coordinating directly with the relevant highway authority. Whether your development requires a new vehicle access, junction improvements, footway widening, upgraded crossings, or cycle infrastructure, we provide practical solutions that satisfy planning conditions and highway standards.
Our understanding of Kingston upon Thames' transport network allows us to design schemes that improve safety, minimise disruption, and integrate effectively with existing infrastructure, helping projects progress efficiently from planning approval through to construction.
Section 278 in Kingston upon Thames
Highway Improvement Design
We prepare detailed engineering designs for highway works including new access roads, junction upgrades, pedestrian crossings, kerb realignments, and footway improvements in accordance with highway authority requirements.
Technical Approval Documentation
Our team prepares the technical submissions required for Section 278 approval, ensuring drawings, specifications, calculations, and supporting documents meet the required engineering standards.
Highway Authority Coordination
We liaise directly with the relevant highway authority throughout the approval process, responding to technical comments and helping progress applications efficiently.
Road Safety & Compliance Reviews
We assess proposed highway works to ensure they improve safety for motorists, pedestrians, cyclists, and public transport users while complying with current design guidance.
Construction Planning Support
Our specialists help coordinate construction phasing, traffic management considerations, and implementation strategies to reduce disruption during highway works.
Planning Condition Support
We provide the technical evidence and highway documentation required to discharge planning conditions relating to Section 278 works, supporting timely project delivery.
Our Section 278 Project in Kingston upon Thames
Our team recently supported a residential redevelopment in Kingston upon Thames where planning permission required several improvements to the surrounding highway network. The scheme included modifications to the site access, new pedestrian crossing facilities, upgraded footways, and revised road markings to accommodate increased activity generated by the development.
We prepared the complete Section 278 package, including highway drawings, engineering details, swept path analysis, and technical documentation for approval by the highway authority. Throughout the design process, we worked closely with the wider consultant team to ensure the highway proposals complemented the overall site layout while maintaining safe traffic movement and accessibility for all users.
Following several design reviews and technical discussions with the authority, the proposals achieved approval, allowing construction to proceed in accordance with planning requirements. Early engagement and well-prepared documentation helped minimise delays and supported efficient project delivery.


Delivering Highway Solutions That Support Planning Approval
A professionally managed Section 278 Agreement is essential for developments that require alterations to the public highway. Delays in obtaining technical approval can significantly affect project programmes, making early planning and experienced engineering support invaluable.
Capital Transport Planning delivers practical, policy-compliant highway designs that balance engineering requirements with the operational needs of each development. Our collaborative approach helps identify potential issues early, reduce unnecessary revisions, and streamline communication with the highway authority. From initial feasibility assessments through to technical approval and construction support, we help clients deliver highway improvements that enhance safety, improve accessibility, and satisfy planning obligations.
By combining transport planning expertise with detailed highway engineering knowledge, we provide reliable support that keeps developments progressing while ensuring every aspect of the Section 278 process is professionally managed.