
Lambeth Highway Planning and Section 278 Expertise
Lambeth is one of South London's busiest boroughs, containing a diverse transport network that serves major residential communities, commercial centres, and key destinations including Brixton, Waterloo, Clapham, and Vauxhall. With high levels of pedestrian activity, extensive cycling infrastructure, and significant public transport usage, highway improvements associated with new developments require careful planning and technical coordination.
Our team has extensive experience preparing Section 278 packages that satisfy Lambeth Council's highway requirements while supporting the wider planning process. Whether your development requires alterations to footways, new vehicle access arrangements, upgraded crossings, junction modifications, or cycle infrastructure, we produce practical and policy-compliant designs that integrate safely into the existing highway network.
Every scheme is developed with consideration for local traffic conditions, accessibility, road safety, and future maintenance obligations. By engaging with the highway authority early in the process, we help minimise delays and keep projects progressing efficiently from planning approval through to construction.
Section 278 Services in Lambeth
Section 278 Agreement Preparation
We prepare the technical documentation required for Section 278 Agreements, ensuring proposed highway works satisfy local authority standards and approval requirements.
Highway Improvement Design
Our engineers produce detailed highway designs for access roads, junction alterations, pedestrian facilities, kerb realignments, and other public highway improvements linked to new developments.
Technical Approval Management
We coordinate the technical approval process by responding to highway authority comments, updating designs where necessary, and supporting successful agreement completion.
Road Safety & Compliance Reviews
Our team assesses proposed highway works to ensure they improve safety for motorists, pedestrians, cyclists, and public transport users while complying with current design standards.
Drainage & Highway Infrastructure Coordination
We incorporate drainage requirements, utility constraints, pavement construction, signage, road markings, and street furniture into comprehensive Section 278 designs.
Construction Support & Implementation
From detailed design through to construction, we provide technical support that helps contractors deliver approved highway works efficiently and in accordance with council specifications.
How We Approach a Section 278 Scheme in Lambeth
Take a mixed-use development in Lambeth that needs a new access, wider footways, upgraded crossings and kerb changes before construction.
For a scheme like this, we would prepare the full Section 278 package of drawings, specifications, swept path analysis and supporting documents with the design team and highway authority, refining it to meet council requirements.
The result would be fewer delays in the pre-construction phase and safer streets for all road users.


Delivering Highway Solutions That Support Development
A professionally prepared Section 278 package is essential for developments that require alterations to the public highway. High-quality technical documentation helps highway authorities assess proposals efficiently while ensuring that completed works meet current engineering standards and safety requirements.
At Capital Transport Planning, we combine transport planning expertise with practical highway engineering knowledge to produce robust and buildable designs. Our collaborative approach helps identify potential design issues early, reducing costly revisions later in the approval process.
We understand the importance of meeting programme deadlines and maintaining clear communication between developers, architects, contractors, and highway authorities. By managing the technical requirements from initial concept through to final approval, we help clients achieve smoother project delivery and greater certainty throughout the planning and construction process.
Frequently Asked Questions
Do I need a Section 278 Agreement in Lambeth?
A Section 278 Agreement is generally required whenever a development involves permanent works on the existing public highway, such as new access points, junction improvements, footway alterations, or pedestrian crossing upgrades. The requirement will typically be confirmed by Lambeth Council during the planning process.
How long does the Section 278 approval process take in Lambeth?
Approval times vary depending on the complexity of the proposed highway works and the level of technical review required. Preparing detailed designs early and responding promptly to council feedback can help reduce overall programme times.
What types of highway works can be delivered under a Section 278 Agreement?
Section 278 Agreements can cover a wide range of highway improvements, including new vehicle accesses, road widening, junction upgrades, traffic islands, pedestrian crossings, cycle facilities, kerb realignments, street lighting, drainage improvements, road markings, and other alterations within the public highway.
