top of page

Section 278 in Southwark

We provide professional Section 278 services in Southwark, helping developers deliver safe, compliant highway improvements that meet planning requirements and support successful project delivery from design through to construction.

Southwark Section 278 Highway Planning Expertise

Southwark is one of London's fastest-evolving boroughs, with major residential, commercial, and mixed-use developments transforming areas such as London Bridge, Elephant and Castle, Bermondsey, Canada Water, and Peckham. As development continues across these busy urban locations, highway infrastructure often requires modification to safely accommodate increased traffic, pedestrian activity, cycling facilities, and public transport access. Many of these improvements are delivered through a Section 278 Agreement.

At Capital Transport Planning, we assist developers, architects, planning consultants, and contractors throughout the Section 278 process in Southwark. Our experienced team prepares highway designs that satisfy the technical requirements of the local highway authority while ensuring proposals integrate effectively with the surrounding transport network.

Every site presents different challenges. Urban developments frequently involve constrained highways, high pedestrian volumes, cycle infrastructure, bus routes, servicing requirements, and complex utility constraints. We carefully assess these factors before producing practical highway designs that improve safety, minimise disruption, and comply with current design standards.

Our collaborative approach ensures that highway proposals progress smoothly through technical approval, helping clients avoid unnecessary delays while supporting efficient project delivery from planning through to construction.

Section 278 Services in Southwark

Highway Design & Technical Drawings

We prepare detailed highway improvement designs suitable for Section 278 approval, ensuring every drawing complies with current standards and the requirements of the highway authority.

Junction & Access Improvements

Our engineers design new access arrangements, junction alterations, road widening, visibility improvements, and traffic management measures that support safe vehicle movements.

Pedestrian & Cycle Infrastructure

We design improved pedestrian crossings, widened footways, cycle facilities, dropped kerbs, and accessibility enhancements that encourage safer and more sustainable travel throughout Southwark.

Drainage, Kerbing & Highway Construction Details

Our technical packages include kerb alignments, carriageway construction details, drainage layouts, pavement specifications, and associated highway engineering solutions required for approval.

Technical Approval & Authority Liaison

We manage communication with the relevant highway authority throughout the approval process, responding to technical comments and coordinating revisions to help progress agreements efficiently.

Construction Support & Project Coordination

From detailed design through implementation, we provide ongoing engineering support, helping contractors deliver approved highway works safely, accurately, and in accordance with the agreed Section 278 design.

Our Section 278 Project in Southwark

Capital Transport Planning recently supported a mixed-use development in Southwark that required several off-site highway improvements before construction could proceed. The scheme included modifications to an existing junction, upgraded pedestrian crossing facilities, new kerb alignments, and improvements to cycle accessibility along the surrounding highway network.

Our engineers developed a comprehensive Section 278 design package, undertaking detailed site assessments, swept path analysis, and highway geometry reviews to ensure the proposed works operated safely within an already busy urban environment. Throughout the technical approval process, we worked closely with the highway authority, responding promptly to design comments and refining the proposals where necessary.

The final approved design successfully balanced operational requirements with the needs of pedestrians, cyclists, buses, servicing vehicles, and general traffic. By delivering a coordinated and technically robust Section 278 package, we helped the client progress their development while ensuring the highway improvements supported long-term safety and network efficiency.

ChatGPT Image Apr 16, 2026, 12_17_20 PM.png
ChatGPT Image Mar 31, 2026, 02_41_39 PM.png

Delivering Efficient Highway Approval and Construction

A professionally prepared Section 278 design is essential for developments requiring alterations to the public highway. High-quality engineering drawings and technical documentation reduce the likelihood of approval delays, minimise design revisions, and provide confidence that proposed works meet all relevant engineering standards.

At Capital Transport Planning, we understand the importance of coordinating highway design with wider planning, transport, and construction programmes. Our experienced engineers develop practical, buildable solutions that reflect both site constraints and authority expectations. By identifying technical issues early, maintaining clear communication throughout the approval process, and producing accurate engineering information, we help developers reduce project risk and keep schemes progressing efficiently from planning approval through to highway construction.

Frequently Asked Questions

Do I need a Section 278 Agreement in Southwark?

A Section 278 Agreement is generally required whenever a development involves permanent alterations to the public highway, such as new access roads, junction improvements, pedestrian crossings, footway works, or traffic management measures.

How long does the Section 278 approval process take in Southwark?

Timescales vary depending on the complexity of the proposed highway works and the level of technical review required. Early design coordination and complete technical submissions can significantly improve the overall approval programme.

Can you manage the entire Section 278 design process?

Yes. We provide complete Section 278 support, including highway design, technical drawings, authority liaison, design revisions, construction support, and coordination throughout the approval and implementation stages, helping clients deliver compliant highway improvements with confidence.

Picture1.png

Capital Transport Planning is an independent consultancy delivering expert transport planning and infrastructure solutions across the UK.

  • Facebook
  • Youtube
  • Instagram
  • LinkedIn

Richmond Office,
Greater London

Address: Parkshot House, 5 Kew Road Richmond upon Thames, TW9 2PR

E: info@capitaltp.co.uk
P: +44 (0)208 1681 911

© 2026 by CTP. All rights reserved.

Website Made By DesignByComfy

bottom of page