
Southwark Section 278 Highway Planning Expertise
Southwark is one of London's fastest-evolving boroughs, with major residential, commercial, and mixed-use developments transforming areas such as London Bridge, Elephant and Castle, Bermondsey, Canada Water, and Peckham. As development continues across these busy urban locations, highway infrastructure often requires modification to safely accommodate increased traffic, pedestrian activity, cycling facilities, and public transport access. Many of these improvements are delivered through a Section 278 Agreement.
At Capital Transport Planning, we assist developers, architects, planning consultants, and contractors throughout the Section 278 process in Southwark. Our experienced team prepares highway designs that satisfy the technical requirements of the local highway authority while ensuring proposals integrate effectively with the surrounding transport network.
Every site presents different challenges. Urban developments frequently involve constrained highways, high pedestrian volumes, cycle infrastructure, bus routes, servicing requirements, and complex utility constraints. We carefully assess these factors before producing practical highway designs that improve safety, minimise disruption, and comply with current design standards.
Our collaborative approach ensures that highway proposals progress smoothly through technical approval, helping clients avoid unnecessary delays while supporting efficient project delivery from planning through to construction.
Section 278 Services in Southwark
Highway Design & Technical Drawings
We prepare detailed highway improvement designs suitable for Section 278 approval, ensuring every drawing complies with current standards and the requirements of the highway authority.
Junction & Access Improvements
Our engineers design new access arrangements, junction alterations, road widening, visibility improvements, and traffic management measures that support safe vehicle movements.
Pedestrian & Cycle Infrastructure
We design improved pedestrian crossings, widened footways, cycle facilities, dropped kerbs, and accessibility enhancements that encourage safer and more sustainable travel throughout Southwark.
Drainage, Kerbing & Highway Construction Details
Our technical packages include kerb alignments, carriageway construction details, drainage layouts, pavement specifications, and associated highway engineering solutions required for approval.
Technical Approval & Authority Liaison
We manage communication with the relevant highway authority throughout the approval process, responding to technical comments and coordinating revisions to help progress agreements efficiently.
Construction Support & Project Coordination
From detailed design through implementation, we provide ongoing engineering support, helping contractors deliver approved highway works safely, accurately, and in accordance with the agreed Section 278 design.
How We Approach a Section 278 Scheme in Southwark
Take a mixed-use development in Southwark that needs junction changes, upgraded crossings, new kerb lines and better cycle access before construction.
For a scheme like this, we would prepare a full Section 278 package with site assessments, swept path analysis and geometry reviews, then work with the highway authority to refine the design.
The result would be a design that balances the needs of pedestrians, cyclists, buses, servicing vehicles and general traffic for long-term safety and network efficiency.


Delivering Efficient Highway Approval and Construction
A professionally prepared Section 278 design is essential for developments requiring alterations to the public highway. High-quality engineering drawings and technical documentation reduce the likelihood of approval delays, minimise design revisions, and provide confidence that proposed works meet all relevant engineering standards.
At Capital Transport Planning, we understand the importance of coordinating highway design with wider planning, transport, and construction programmes. Our experienced engineers develop practical, buildable solutions that reflect both site constraints and authority expectations. By identifying technical issues early, maintaining clear communication throughout the approval process, and producing accurate engineering information, we help developers reduce project risk and keep schemes progressing efficiently from planning approval through to highway construction.
Frequently Asked Questions
Do I need a Section 278 Agreement in Southwark?
A Section 278 Agreement is generally required whenever a development involves permanent alterations to the public highway, such as new access roads, junction improvements, pedestrian crossings, footway works, or traffic management measures.
How long does the Section 278 approval process take in Southwark?
Timescales vary depending on the complexity of the proposed highway works and the level of technical review required. Early design coordination and complete technical submissions can significantly improve the overall approval programme.
Can you manage the entire Section 278 design process?
Yes. We provide complete Section 278 support, including highway design, technical drawings, authority liaison, design revisions, construction support, and coordination throughout the approval and implementation stages, helping clients deliver compliant highway improvements with confidence.
