top of page

Section 278 in Wandsworth

We provide professional Section 278 services in Wandsworth, helping developers, landowners, and construction teams design, secure approval for, and deliver highway improvements associated with new developments. Our experienced transport planning consultants work closely with the local highway authority to ensure every scheme is compliant, practical, and progresses smoothly from planning through to construction.

Section 278 Highway Solutions in Wandsworth

Wandsworth continues to experience substantial residential, commercial, and mixed-use development, with major regeneration taking place across areas such as Battersea, Nine Elms, Putney, and Wandsworth Town. As development increases, improvements to the surrounding highway network are often required to maintain safety, accessibility, and traffic efficiency. Where works affect the public highway, a Section 278 Agreement is commonly required before construction can begin.

At Capital TP, we provide comprehensive Section 278 support throughout Wandsworth, assisting clients with every stage of the process. From the initial highway design and feasibility assessments through to technical approvals, stakeholder coordination, and construction support, we ensure all highway proposals satisfy local authority requirements. Whether your development requires new access arrangements,
junction modifications, pedestrian crossings, footway improvements, or cycling infrastructure, our team delivers technically robust solutions that minimise delays and support successful project delivery.

Section 278 in Wandsworth

Highway Design & Engineering

We prepare detailed highway designs for proposed improvements, ensuring every element complies with current design standards and the technical requirements of the highway authority.

Technical Approval Management

Our consultants manage the technical approval process from submission through to approval, coordinating with all relevant stakeholders to keep projects progressing efficiently.

Junction & Access Improvements

We design safe and effective access arrangements, junction upgrades, and vehicle entry points that improve connectivity while maintaining highway safety.

Pedestrian & Cycle Infrastructure

Our Section 278 schemes incorporate high-quality pedestrian and cycling facilities that enhance accessibility and support sustainable travel objectives throughout Wandsworth.

Utility & Stakeholder Coordination

We liaise with statutory undertakers, local authorities, contractors, and project teams to coordinate works efficiently and minimise disruption during delivery.

Construction Support & Site Supervision

Our team provides ongoing technical support throughout construction, assisting with inspections, approvals, and compliance to ensure highway works are delivered to the required standard.

How We Approach a Section 278 Scheme in Wandsworth

Take a residential-led development in Wandsworth that needs a redesigned access, wider footways, upgraded crossings and better visibility splays before occupation.

For a scheme like this, we would prepare the full Section 278 package, carry out geometry assessments and manage technical approval, working with the developer, architects, engineers and contractors to keep to programme.

The result would be a compliant package that helps the development meet its planning obligations on time.

ChatGPT Image Apr 16, 2026, 12_17_20 PM.png
ChatGPT Image Mar 31, 2026, 02_41_39 PM.png

Delivering Compliant Highway Infrastructure

A professionally managed Section 278 Agreement helps ensure that highway improvements are designed, approved, and delivered efficiently while meeting all statutory requirements. Poorly prepared highway submissions can result in lengthy approval periods, additional costs, and construction delays.

At Capital TP, we combine transport planning expertise with practical highway engineering knowledge to provide a complete Section 278 service. Our experienced consultants identify potential issues early, develop practical engineering solutions, and work collaboratively with local authorities to achieve timely approvals. By managing every stage of the process, we reduce project risk, improve programme certainty, and help developers satisfy planning conditions with confidence.

Frequently Asked Questions

Do I need a Section 278 Agreement in Wandsworth?

A Section 278 Agreement is generally required whenever a development involves permanent alterations to the existing public highway. The local highway authority will determine whether the proposed works require a formal agreement during the planning process.

How long does a Section 278 approval take in Wandsworth?

The approval period varies depending on the complexity of the highway works, design revisions, and technical review requirements. Early engagement and high-quality submissions can significantly reduce approval times.

What types of highway works are covered under Section 278?

Section 278 Agreements commonly cover new site access roads, junction improvements, pedestrian crossings, cycle facilities, footway widening, traffic islands, highway realignment, traffic signal modifications, and other infrastructure improvements required to support new developments.

Capital Transport Planning logo

​Capital Transport Planning is an independent consultancy delivering expert transport planning and infrastructure solutions across the UK.

  • Facebook – Capital Transport Planning
  • Youtube – Capital Transport Planning
  • Instagram – Capital Transport Planning
  • LinkedIn – Capital Transport Planning

Richmond Office,
Greater London

Address: Parkshot House, 5 Kew Road Richmond upon Thames, TW9 2PR

E: info@capitaltp.co.uk
P: +44 (0)208 1681 911

© 2026 by CTP. All rights reserved.

Website Made By DesignByComfy

bottom of page