If your planning application includes a new access, a widened driveway or a change to a junction, the highway officer will almost certainly ask about visibility splays. Get them wrong and the application can be refused on highway safety grounds. This guide explains what a visibility splay is, how it's calculated and what councils expect to see on your drawings.

What is a visibility splay?

A visibility splay is the triangle of land that must be kept clear so a driver leaving an access or side road can see traffic coming along the main road, and be seen by it. It's drawn on plan as a line from the driver's position to a point along the main road, and everything inside that triangle needs to stay free of obstructions.

Every splay is described by two measurements:

  • The X distance: how far back from the edge of the main road the driver's eye is assumed to be.

  • The Y distance: how far along the main road the driver needs to be able to see, in each direction.

So "2.4m x 43m" means a driver 2.4 metres back from the carriageway edge must be able to see 43 metres along the road.

The X distance

The X distance is measured back from the edge of the main road's carriageway, along the centre of the access. Manual for Streets uses:

  • 2.4 metres for most accesses and junctions in built-up areas. This is the usual starting point.

  • 2.0 metres in some very lightly trafficked, slow-speed situations, such as a single private driveway. Some councils, for example Southwark on 20mph streets, only accept this as an agreed departure from their standard.

  • 4.5 metres or more at busier junctions, where a car may be waiting behind the first one.

Check your council's design guide, because some set their own X distances for driveways and shared accesses.

The Y distance

The Y distance is based on the stopping sight distance: how far a driver on the main road needs to see to react and stop safely. It depends on the speed of traffic, which is why the figure changes from road to road.

For streets with speeds up to about 37mph (60kph), councils normally use the Manual for Streets values:

Speed of traffic

Y distance

20mph

25m

25mph

33m

30mph

43m

On faster roads, the Design Manual for Roads and Bridges (DMRB) usually applies instead, and the distances are much longer.

Speed limit or actual speed?

The Y distance should reflect the speed traffic actually travels, not just the speed limit. If drivers regularly exceed the limit, a splay based on the limit will be too short. If they travel well below it, for example on a narrow street with parked cars, a shorter splay may be justified.

That's where a speed survey comes in. Speeds are measured in both directions and the 85th percentile speed (the speed 85% of drivers travel at or below) is used to set the Y distance. Surveys done in dry weather are usually adjusted down slightly to give a wet-weather speed. A speed survey is often the cheapest way to show that a constrained access can achieve acceptable visibility.

Pedestrian visibility splays

As well as seeing traffic on the road, a driver leaving a driveway must be able to see people walking along the footway. Councils usually ask for pedestrian visibility splays on each side of a driveway, commonly 2m x 2m, though some use 1.5m or 2.4m. They are measured from the back edge of the footway along the edge of the access.

Walls, fences, hedges and bin stores at the front of a property are the usual problem, so pedestrian splays often shape the front garden design.

What has to stay clear

Everything inside the splay needs to be kept clear of anything that would block the view between a driver's eye and an approaching vehicle or person. In practice that means:

  • no walls, fences, hedges or planting above about 0.6 metres (some councils use 0.9m or 1.05m)

  • no parked cars, bin stores or signs within the splay

  • trees and lamp columns only where the council accepts they don't block the view

Councils usually secure this with a planning condition requiring the splays to be kept clear for as long as the access is in use.

Who must own the land?

The whole splay must be on land the applicant controls or on public highway. If it crosses a neighbour's front garden, there's no way to make sure it stays clear, and the access may be refused. This is one of the most common reasons a new access fails, so check land ownership early.

What councils expect in an application

A highway officer will usually want:

  • a scaled drawing showing the access, the X and Y distances and the splay lines in both directions

  • the speed the Y distance is based on, and the speed survey if you're relying on actual speeds

  • pedestrian splays for driveways

  • confirmation that the splays are within your land or the highway

  • where relevant, swept path analysis showing vehicles can use the access safely

If the access changes the public highway, for example a new junction or a widened crossover, the works may also need a Section 278 agreement or a vehicle crossover licence. → S38 vs S278 Agreements: What's the Difference?

Common problems

  1. Using the speed limit when traffic is faster, so the splay is too short

  2. Splays crossing third-party land

  3. Forgetting pedestrian splays on driveways

  4. Parked cars in the splay on the main road, which the council may ask you to address with parking restrictions

  5. Walls or planting in the splay shown on the landscape plan but not picked up on the highway drawing

How Capital Transport Planning can help

We design site accesses and junctions across London and the South East, and prepare the visibility splay drawings, speed surveys and swept path analysis that highway officers ask for. We also handle the Section 278 agreements that follow when works affect the public highway.

Need visibility splays for a planning application? Get in touch for a quote.

Frequently asked questions

What does 2.4m x 43m mean? A driver 2.4 metres back from the edge of the main road must be able to see 43 metres along it in each direction. 43m is the Manual for Streets figure for traffic travelling at 30mph.

What visibility splay do I need on a 20mph road? Usually 2.4m x 25m, based on Manual for Streets. Some councils accept a 2.0m X distance on lightly trafficked 20mph streets.

Can I reduce a visibility splay? Sometimes. A speed survey showing traffic is slower than the limit can justify a shorter Y distance. Any reduction needs the highway authority's agreement.

Can a visibility splay cross my neighbour's land? Not unless you have a legal right to keep it clear. Councils generally require the splay to be on land you control or on the public highway.

How high can a wall be in a visibility splay? Councils commonly allow nothing above about 0.6 metres, though some use 0.9m or 1.05m. Check your council's design guide.

Sources

 
 
 

Recent Posts

See All

Comments


Capital Transport Planning logo

​Capital Transport Planning is an independent consultancy delivering expert transport planning and infrastructure solutions across the UK.

  • Facebook
  • Youtube
  • Instagram
  • LinkedIn

Richmond Office,
Greater London

Address: Parkshot House, 5 Kew Road Richmond upon Thames, TW9 2PR

E: info@capitaltp.co.uk
P: +44 (0)208 1681 911

© 2026 by CTP. All rights reserved.

Website Made By DesignByComfy

bottom of page