Section 278 Agreements: Fees, Bonds and Commuted Sums Explained

A Section 278 agreement lets a developer carry out works on the existing public highway, such as a new access, junction changes or footway improvements. It is made under Section 278 of the Highways Act 1980 and is usually required by a planning condition or Section 106 obligation. The cost of the agreement is more than the construction works alone, and it often surprises developers late in a project.
What you pay for
Most highway authorities recover their costs through four main items.
Technical approval and design check fee. The council reviews your highway drawings, road safety audits and specifications. This is often charged as a percentage of the estimated works cost, sometimes with a minimum fee.
Inspection and supervision fee. The council's engineers inspect the works on site until they are completed and signed off. Again, this is commonly a percentage of the works cost.
Legal fees. The council's legal team drafts and completes the agreement. These are usually charged on time spent and confirmed once the draft is prepared.
Commuted sums. A payment to cover the future maintenance of anything the council will have to look after that it would not otherwise have had, such as new street lights, non-standard paving, trees or drainage.
The bond
The agreement is normally backed by a bond, or a cash deposit instead of a bond. The bond protects the council if the developer fails to finish the works, so it is set at a figure linked to the estimated cost of completing them. It is released, usually in stages, once the works are completed and the maintenance period ends.
A bond is not a fee, but it still affects cash flow and must be in place before work starts on the highway.
When the money is due
In most authorities the fees and bond must be in place before the agreement is signed and before any highway works begin. Commuted sums are often payable on completion of the agreement or before the final certificate is issued, depending on the council.
Other costs to allow for
Road safety audits (Stage 1 and 2 at design, Stage 3 after construction)
Traffic management, temporary traffic orders and road space bookings
Utility diversions and statutory undertaker costs, which are often the largest unknown
Licences for scaffolding, hoardings or cranes over the highway, which are charged separately
How to keep costs down
Get the design right first time. Each round of comments adds review time and delays the agreement.
Use standard materials where you can. Non-standard surfaces and street furniture attract higher commuted sums.
Check utilities early. Order searches and trial holes before the detailed design is fixed.
Start the process early. Agreements can take several months, so begin once the design is agreed in principle, not when the site is ready to start.
Not sure whether your works need a Section 278 or a Section 38 agreement? Read S38 vs S278 Agreements: What's the Difference?
How Capital Transport Planning can help
Capital Transport Planning prepares Section 278 designs and drawings, manages the technical approval process with the highway authority, and coordinates road safety audits. Call us on 020 8168 1911 to discuss your scheme.
See our legal agreements and highway works services and highway design services, or get in touch for a quote.